Embracing Woodworking Technology

Home
About Us
Case Study
Product Introduction
Contact Us
Download Centre

EMB Software Pty Ltd
PO Box 1086
Terrigal
NSW 2260
Australia
Tel : 02 4381 0742
General Enquiries
 
Email: info@emb-software.com
 

Labour Times ] [ Materials ] Estimating ] Production ]


Materials

For speed and convenience regularly used materials are stored on the main materials library file, which can be accessed when required throughout the system 

 

Each item is given a stock code, description, category type (e.g. Timber), unit of measure (e.g. m3), current cost and estimating unit rates and wastage percentage rate. The waste rate allocated to each material can be adjusted for each job or estimate.

In order to keep the main file as small as possible any materials that are unique to certain jobs or estimates can be stored in a special materials file associated with each job or estimate.

A surface coatings file for paint and wood stain finishes etc. can be established with a choice of material rates and application times on a m2 basis. The user specifies the components that are to be coated and WOODMAN automatically calculates the component surface area and applies the cost and application rates accordingly.


"For speed and convenience regularly used materials are stored on the main materials library file"


 
About Us ] Case Study ] Product Introduction ] Contact Us ] Download Centre ]
2008 EMB Software Pty Ltd.